Sign In | Join Free | My benadorassociates.com
China Jinzhou City Shitan Machinery Equipment  CO. LTD. logo
Jinzhou City Shitan Machinery Equipment CO. LTD.
Jinzhou City Shitan Machinery Equipment CO. LTD.
Verified Supplier

5 Years

Home > Soil Testing Drilling Rig >

Outdoor Borehole Exploration Soil Testing Drill Rigs Equipment 200 Meters

Jinzhou City Shitan Machinery Equipment CO. LTD.
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now

Outdoor Borehole Exploration Soil Testing Drill Rigs Equipment 200 Meters

  • 1
  • 2

Brand Name : ShiTan

Model Number : GK-200

Certification : ISO9001

Place of Origin : China

MOQ : 1 set

Price : USD4500-5800/SET

Payment Terms : T/T, Western Union

Supply Ability : 20000 sets per year

Delivery Time : Within 7-12 days

Packaging Details : wooden box

Name : Soil Testing Drilling Rig

Power Type : Diesel

Voltage : 220v

Dimension(L*W*H) : 1730*860*1360

Application : water well,railways, core

Type : Small core drill rig

Max Drilling Depth : 200 meter

Drilling diameter : 300 mm

Condition : New

Color : Customized

Warranty : 24 months

OEM : Acceptable

Contact Now

Outdoor Borehole Exploration Soil Testing Drilling Rig Equipment 200 Meters

GK 200 Soil Testing Drilling Rig Description

GK200 is a lightweight shallow hole rig which can be drilling depth max 200M,diamter 75-300mm,with oil pressure feed.

Mainly used for geological general investigation and exploration,road and tall buliding foundation exploration

GK 200 Soil Testing Drilling Rig Tech Data

GK 200 Soil Testing Drilling Rig
Drilling diameter(mm) 75-300mm
Drilling depth (m) 200-30m
Drill pipe diameter (mm) 42,50
Drilling angle(°) 90~75
Equipment size(L * B * H) 1730 * 860 * 1360 (mm)
Rig weight (except engine) 700
Mobile device
Moving length 350mm
Leave distance 300mm
Gyrator
Spindle speed (four gear) (r/min) 115,230,505,1010
Spindle travel(mm) 450
Spindle no-load lifting maximum moving speed(m/s) 0.05
Spindle no load drop maximum movement speed(m/s) 0.067
Spindle maximum feed pressure(KN) 15
Spindle maximum lifting force(KN) 25
Spindle maximum output torque(KN• m) 1.5
Winch assembly
Winch maximum lifting force (single rope) 20
Reel speed (r/min) 20,39,85,170
Reel circumferential speed(m/s) 0.172,0.345,0.738,1.476
Reel diameter(mm) 140
Wire rope diameter(mm) 9.3
Wire rope density (m) 40
Brake diameter(mm) 278
Brake band width (mm) 50
Oil pump
Oil pump type YBC -20/125
Nominal pressure (Mpa) 12.5
Rated flow(ml/r) 20
Rated speed(r/min) 800-2500
Diesel engine or motor
Diesel engine 1115
Rated power (KW) 16.2
Rated speed (r/min) 2200
Rated pressure(Mpa) 12.5
Motor type Y160M - 4
Rated power (KW) 11
Rated speed (r/min) 146

GK 200 Soil Testing Drilling Machine Advantages

1. Adopt Low speed high torque hydraulic motor drive rotary device output torque
2. The advantage of cylinder is promoting more stable, less failure significantly than the motor propulsion.
3. Equip two filter effectively to ensure the safety of diesel engine intake and prolong engine life.
4. It can readily monitor rig hydraulic system pressure and boost pressure to ensure the rig stable and efficient operation.
5.Using well-known brands of multi-way control valve, superior performance, handle centralized, easy to operate

Why is the the drilling rig not suitable for use in rainy days?

After the well is completed, it is necessary to pump water to check the results. Under normal circumstances, a large drawdown pumping can be done. The stable duration of the water level shall not be less than eight hours, and the water flow of the dynamic water level of the well shall be measured at the same time. The well drilling project shall ensure the smooth drainage of the construction site, so the rainy season shall be avoided. When working while excavating, the excavation slope shall be determined according to the physical and mechanical properties of the soil layer, generally 1:1.5, and there shall be a certain distance from the toe of the spoil slope to the upper opening of the excavation. For large wells with water inflow from the shaft wall, the water inlet hole and inverted filter layer of the shaft wall must be arranged according to the design requirements, and the water inlet hole shall be prevented from being blocked during construction. The filter material enclosure at the aquifer shall meet the requirements, the backfill shall have a certain superelevation, and the frozen soil in the backfill in winter shall not exceed 15%.

Outdoor Borehole Exploration Soil Testing Drill Rigs Equipment 200 Meters

Outdoor Borehole Exploration Soil Testing Drill Rigs Equipment 200 MetersOutdoor Borehole Exploration Soil Testing Drill Rigs Equipment 200 Meters


Product Tags:

borehole exploration soil testing drill rigs

      

200 meters soil testing drill rigs

      

200 meters soil testing drilling rig

      
Quality Outdoor Borehole Exploration Soil Testing Drill Rigs Equipment 200 Meters for sale

Outdoor Borehole Exploration Soil Testing Drill Rigs Equipment 200 Meters Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Jinzhou City Shitan Machinery Equipment CO. LTD.
*Subject:
*Message:
Characters Remaining: (0/3000)