| Sign In | Join Free | My benadorassociates.com |
|
Brand Name : JINZHOU SHITAN
Model Number : Gy 200
Certification : ISO9001
Place of Origin : China
MOQ : 1 set
Price : Negotiation
Payment Terms : T/T, Western Union
Supply Ability : 20000 sets per year
Delivery Time : 7-12 days
Packaging Details : Standard Export Package
Product Name : GY 200 Geological Drilling Rig
Condition : New
Type : Core Drilling Rig
Power Type : Diesel
Usage : Water Well,geological exploration
Voltage : 380V
Power(W) : 16.2kw
Dimension(L*W*H) : 1730*860*1360mm
Weight : 585kg
Drilling Depth : 300m
Drilling Diameter : 75-200mm
Engine : Diesel Power
Easy Movement 300 Meters Detph Farming Geological Drilling Rig For Civil Construction
GY 200 Geological Drilling Rig Introduction:
GY-200 's drilling depth is 300 meters ,hole diameter is 300 mm.It was designed for geologic structure prospecting of industrial and civil constructions, such as railways, bridges and hydroelectric projects. The drilling machine could also being used for small calibre piling foundation works
GY 200 Geological Drilling Rig Technical Parameters:
| Drilling depth | 60-295m |
| Drilling diameter | 300mm 76 46mm |
| Drill pipe diameter | 50 42mm |
| Spindle Turnable Angle | 0-360degree |
| Net weight(excluding the power machine) | 670kg |
| Dimension(length*width*height) | 1820*980*1400mm |
| Revolving Plate | |
| Spindle speed | 900 475 388 205 157 68 r/min |
| Maximum torque | 2000N*m |
| Driving travel | 400mm |
| Maximum Cylinder driving force | 2,9000N |
| Maximum Cylinder lifting force | 3,9000N |
| Lifter | |
| Lifting capacity | 3,0000N |
| Bobbin line speed (2 layers) | 0.27 0.64 0.83 1.58 1.64 m/s |
| Bobbin diameter | 135mm |
GY 200 Geological Drilling Rig Technical Advantage:
Drilling rig is mainly used for geological general investigation and exploration,road and tall buliding foundation exploration,kinds of hole in concrete structure,river levees,subgrade grouting hole,drilling and driect grouting,civil wellsand earth temperature central air-conditioner,etc.
What is the best time to do soil sampling?
Soil samples can be taken any time throughout the year. It is important though to sample approximately the same time of the year. Late summer, or early fall, is a good time for most crops. This allows time for lime recommended to react and change the pH before the crop is planted.
Jinzhou Shitan Machinery Equipment Co., Ltd. Main Products:
Pneumatic Drilling Rig / Air Drilling Rig(ST-180, ST-200, ST-260, ST-300, ST-350, ST-400, ST450, ST-450, ST-500, ST-600, ST-800 and other Pneumatic water well drilling Rigs.), Crawler Water Well Drilling Rig / Trailer Mounted Drilling Rig / Water Well Drilling Rig / Hydraulic Borewell Machine / Hard Rock Drilling Equipment / Diamond Core Drill Rig / Geological Drilling Rig / Soil Testing Drilling Rig / Portable Water Well Drilling Rig(ST-30,ST-50,XY-1A, XY-1B, XY-2, XY-2B, GK180, GK200, GY150, GY200 and 30 impact drill rig, ZLJ series tunnel drilling rig and other geological drilling machines)Crawler Track Undercarriage, Drilling Mud Pump(BW150,BW160,BW200,BW250,BW850 series Drilling mud pumps), Drilling Air Compressor, Water Well Drill Bits(PDC Drill Bit, Tricone Bit, DTH Button Bit), Water Well Drill Pipe, Drilling Rig Spare Parts( drilling rods , drilling rods joint , casing pipe, casing coupling, core tube, core tube coupling, lifters, automatic drop hammer, sampler, SPT tool, wrench fork, pad fork, lock joint), Track Transporter
OEM / ODM can accept. Good quality, professional after-sales service, welcome to order



|
|
Structure Prospecting Geological Drilling Machine 300 Meters Detph Images |